1. Drag system to the silos:
In order to create the convenience to customers, BMT have got hot asphalt concrete preservation system with 600 tons storage include 3 silos, which could store asphalt concrete until 4 days. Asphalt concrete after loaded out of drum mixer will be transported by drag conveyor, which is 35m of length and 25m of height, and then be dropped down into the silos

Silos system and drag
Automatic damper system in the chimney of dust collection exhauster allow us to economize the cost for drying the aggregate, damper adjust automatically, control the pressure and gas speed from dust collection exhauster to Double Barrel in order to create the most drying effect equivalent with aggregate quantity in the dryer.
2. Silos system and loading system
Similar to controlling temperature of system, liquid bitumen temperature control create optimal viscosity to produce hot asphalt concrete, liquid bitumen temperature control system of BMT always control the required temperature over 150oC. Vertical liquid asphalt tub system with maximum capacity is 150 tons and insulating pipe system could keep the required temperature of liquid system for 3000 tons continuous production without supplies.
In the period of loading time, silos system with only 1 minute loading time for 1 truck with 30 tons, with this silos, BMT could ensure about the ordered quantity of customer from the beginning of the morning, ensure to the customer that they can control the human resource, equipment resource at the site, as possible as control the weather condition on the rain season. BMT could help the customer with small quantity and correspondent times.

3. Transportation system:
Transportation system of BMT with the quantity up to 40 heavy dumper trucks and 10 light dumper trucks, transported quantity can get 1000 tons/circle/3h
- This transportation system allow BMT to supply 3000 – 4000 tons per day
- This system give more convenience to customers in executing the big projects with vast quantity, decrease human cost and machine cost at the construction site.

Transportation system after loading asphalt concrete and concentration at the construction site